Proudly serving Sacramento, Folsom, Fair Oaks, Carmichael & all of Sacramento County

200+ 5-Star Reviews

SACRAMENTO BATHBathroom Remodeling
Sacramento tub-to-shower conversion featuring frameless glass walk-in shower in former tub alcove with brushed-gold rainfall fixtures, large-format porcelain tile, and built-in tile niche.

TUB-TO-SHOWER CONVERSION

Tub-to-Shower Conversions Across Sacramento County.

Replace an unused tub with a real frameless-glass walk-in shower in two to three weeks. Same footprint, dramatically different room.

  • 200+5-Star Reviews
  • 5-YearWorkmanship Warranty
  • 14–21 DayTypical Build
  • LicensedBonded & Insured

Almost every Sacramento County home built between 1985 and 2008 has a tub the homeowners never use. The 60-inch alcove tub-shower combo in the hall bath, the 5-foot garden tub deck in the primary suite, the second-floor builder-grade soaker — these tubs were specified by builders who were optimizing resale checkboxes, not how the room would actually get lived in. Twenty years later the tubs collect dust, the surrounds yellow, the vinyl pans crack, and the homeowner steps into the shower nozzle every morning instead of bathing.

The tub-to-shower conversion is the single highest-leverage remodel we do. The plumbing supply lines are already there. The drain is already roughed in (we move it, but the rough-in saves money). The framing is already correct. Two to three weeks of demolition, waterproofing, tile, and frameless glass turns the room into one you actually use. We build about 80 conversions a year across Folsom, Elk Grove, Rancho Cordova, Carmichael, Fair Oaks, Sacramento, and the surrounding cities — what follows is the playbook.

WHAT YOU GET

The Tub-to-Shower Build, Spec by Spec

Every conversion we install starts from the same foundation of materials and methods. Tier-up from there based on your home and budget.

  • Same Footprint, New Shower

    Your existing 60" or 54" tub alcove becomes a real walk-in shower without expanding the bathroom or stealing space from another room.

  • Frameless 3/8" Glass

    Custom-measured tempered glass with brushed-gold, polished-chrome, matte-black, or brushed-nickel hardware. No bottom track to mildew.

  • Curbless or Low-Curb

    Roll-in entries for accessibility, low-curb (4") for traditional looks. Both fully waterproofed to the same standard.

  • Drain Relocation Handled

    We cut the slab or work from the crawlspace to move the drain to where the new shower needs it. Permit pulled, inspection passed.

  • Real Waterproofing

    Schluter Kerdi or Wedi membrane behind every wall and under the pan. The single biggest difference between our conversions and a 90s-era retrofit.

  • 14–21 Day Build

    Most tub-to-shower conversions wrap in three weeks or less. Faster on stock-tile selections, longer on custom slab.

The drain move and why it actually matters

A standard alcove tub has its drain at one end of the 60-inch footprint. A walk-in shower needs the drain in the middle, or running along one side as a linear drain. Moving that drain is the single most-skipped step in cheap conversions, and it's the reason a $5,000 tub-to-shower “refresh” that leaves the drain at the original location ends up with standing water at the far end of the shower for the next twenty years. We move the drain on every conversion we do.

On a slab-on-grade Sacramento County home, moving the drain means cutting the concrete. We saw a 24"-wide channel from the existing drain location to the new one, run new ABS in trench at the correct slope (1/4" per foot), tie into the existing waste line, repour the slab section, and let it cure 24 hours before the pan goes in. About a half-day of work plus the cure, $1,800–$2,400 added to the project. On a raised-foundation home we work from the crawlspace below — easier, faster, $900–$1,400 added.

The slope of the new shower pan is what makes everything else work. We always slope at 1/4" per foot from the perimeter to the drain. The pan goes in over the relocated drain, gets fully waterproofed with Schluter Kerdi or Wedi, and the floor tile sets on top of that. Done correctly, the water moves to the drain in seconds. Done badly, you have standing water for a decade.

Curbless vs. low-curb in a tub conversion

About 30% of our Sacramento County conversions go curbless (zero-threshold entry), 70% go low-curb (about 4" tall). Curbless reads as more contemporary, plays into aging-in-place planning, and is the dominant choice in Estate-tier primary remodels. It also costs about $2,200 more because of the slab cut and the additional structural-only inspection some jurisdictions require.

Low-curb makes glass selection easier (door panels can sit on the curb), matches buyer expectations in mid-market Sacramento County homes, and is what we recommend for most hall-bath conversions where resale is a near-term consideration. Both are fully waterproofed to the same standard. The choice is aesthetic and budgetary, not structural.

Glass: why frameless is the only choice

Framed and semi-frameless enclosures look dated within five years in Sacramento County. The aluminum oxidizes in our hard water, the bottom seals mildew, and the metal frames clash with everything modern Sacramento County buyers want. We default to 3/8" frameless tempered glass on every conversion. The hardware (hinges, U-channels, handles) is brushed-gold, polished-chrome, matte-black, or brushed-nickel. Glass is custom-measured after the tile sets, never before — tile shifts the opening dimensions by 1/4" or more.

For openings wider than 36" or door-only configurations on larger conversions, we upgrade to 1/2" glass. It costs about 25% more but it sits more rigidly in the opening and feels like a piece of architecture. Most Estate-tier conversions in Rancho Murieta and Gold River use 1/2" throughout.

HOW IT WORKS

Five Steps from Free Quote to Final Walkthrough

Every Sacramento Bath conversion follows the same predictable process. You always know what's next.

  1. 01

    In-Home Consultation

    We measure the existing tub alcove, check the slab or joist condition, evaluate the drain run, and price three real material options on the spot.

  2. 02

    Design & Material Selection

    You pick tile, glass thickness, fixtures, niche placement, and bench configuration at our showroom or via a curated digital lookbook.

  3. 03

    Permits & Glass Order

    We pull the plumbing and building permits with your local jurisdiction. Custom glass is ordered after tile sets, never before.

  4. 04

    Build

    Demolition, drain relocation, waterproofing (Schluter Kerdi or Wedi), tile, fixtures, and glass — every step inspected before moving on.

  5. 05

    Walkthrough & Warranty

    Final walkthrough with you, a written care guide for tile and glass, and our 5-year workmanship warranty.

REAL PROJECT EXAMPLES

Tub-to-Shower Conversions Across Sacramento County

From 1990 builder-grade alcove tubs to 1985 garden-tub primary decks — every conversion gets real waterproofing and frameless glass.

Some pairs are design renders — real Sacramento project photography is being added on completion.

  • Before — Sacramento builder-grade drop-in alcove tub with dated tile surround and aluminum-frame sliding doors.
    BEFORE
    After — same alcove rebuilt as a frameless-glass walk-in shower with large-format porcelain tile, brushed-gold fixtures, and built-in niche.
    AFTER

    Folsom Empire Ranch tub-to-shower conversion — 18-day completion, low-curb entry, 24×48 porcelain, frameless 3/8" glass.Design render

INVESTMENT RANGES

Three Tiers, Real 2026 Numbers

Sacramento County tub-to-shower conversions — labor, materials, permits, drain relocation, and frameless glass included.

Ranges shown reflect typical Sacramento County projects. Final estimates personalized to your home.

  • Essential

    $14,000 – $22,000

    Standard alcove tub-to-shower conversion with quality mid-range materials and frameless glass.

    • 60" alcove footprint, low-curb entry
    • Mid-range porcelain tile (12×24)
    • Frameless 3/8" tempered glass
    • Single rainfall showerhead
    • Recessed niche
    • 5-year workmanship warranty
  • Most Popular

    Signature

    $22,000 – $32,000

    Custom tub-to-shower conversion with curbless entry, integrated bench, and upgraded fixtures.

    • Curbless entry, linear drain
    • Large-format porcelain (24×48) or marble-look
    • Frameless glass with brushed-gold hardware
    • Rainfall + handheld wand + thermostatic valve
    • Integrated tile bench + dual niches
    • Premium waterproofing (Schluter Kerdi)
  • Estate

    $32,000 – $48,000

    Spa-tier tub-to-shower conversion for primary suites — multi-zone fixtures, custom stone, premium glass.

    • Multi-zone shower (rainfall, body sprays, handheld)
    • Natural stone or porcelain slab walls
    • 1/2" frameless glass with custom hardware
    • Steam unit ready (or installed)
    • Heated bench, integrated lighting
    • Designer-led material curation

When the conversion is the right call (and when it isn't)

The conversion is the right call when the existing tub is unused, when the home has at least one other tub for resale and family use, and when the homeowner wants a real walk-in shower without expanding the bathroom footprint. About 70% of our conversion consultations end with us recommending the project go forward. The other 30% — we recommend either keeping the tub or building a tub-and-shower combination instead.

The conversion is not the right call when the tub is the home's only bathing option (unless the homeowner is committed to never selling), when the bathroom is the only full bath in a family-oriented Elk Grove or Folsom neighborhood where buyers expect a tub somewhere, or when the existing room is too small to comfortably accommodate a real walk-in shower (under 30 square feet of footprint). We'll always run that math on-site before recommending the work.

For Sacramento County homes with three or more bathrooms, the conversion is almost always a clear win. For homes with two bathrooms, we'll convert one if the other has a tub. For single-bathroom homes (most common in 1920s Land Park, Curtis Park, and East Sac), we typically recommend a tub-and-shower combination or keeping the tub and refreshing the surround.

Material spec for Sacramento's hard water

Sacramento County water tests at 6–14 grains per gallon depending on neighborhood. That hardness drives the conversion material spec the same way it drives every other shower we build. Glazed porcelain in large formats wins because it's non-porous and the wider grout pattern is easier to seal annually. Natural stone needs twice-yearly sealing if you're committed; otherwise we steer toward marble-look porcelain slabs.

On fixtures, we curate from Kohler, Delta, Hansgrohe, and Brizo. Thermostatic valves come standard on every Signature and Estate conversion because Sacramento's afternoon water-pressure dips will scald you when someone flushes a toilet upstairs. Brushed-gold and brushed-nickel finishes hide water spots better than polished chrome — a real factor in our hard water.

WHAT HOMEOWNERS SAY

Recent Sacramento County Conversion Reviews

  • We had a 1992 garden tub deck nobody had used in fifteen years taking up a third of our Folsom primary. Sacramento Bath converted it to a curbless walk-in shower in three weeks. We use the room every day now.

    Stephanie B.

    Folsom · Tub-to-shower conversion

  • Our hall bath in Elk Grove had a builder-grade tub-shower combo and a vinyl pan that had been quietly leaking for years. They tore it out, did real waterproofing, and the new shower feels like the room was always supposed to be this way.

    Jordan H.

    Elk Grove · Tub-to-shower swap

  • They cut the slab on our Rancho Cordova ranch to do a true curbless conversion. Three other contractors said it couldn't be done. Eighteen days later we have a spa.

    Aiyana C.

    Rancho Cordova · Curbless conversion

QUESTIONS WE GET WEEKLY

Tub-to-Shower Conversion FAQs

  • How much does a tub-to-shower conversion cost in Sacramento County?

    A standard alcove tub-to-shower conversion (60" footprint, frameless glass, mid-range porcelain, single rainfall head) runs $14,500–$22,500 in 2026. A larger or custom conversion with curbless entry, integrated bench, dual niches, body sprays, and premium tile typically lands $24,000–$38,000. The conversion costs about $2,500–$4,800 less than building a walk-in shower in a brand-new location because the plumbing supply lines and drain are already there.

  • How long does the conversion take?

    Most Sacramento County tub-to-shower conversions take 14 to 21 working days from demolition to final walkthrough. Demolition and waterproofing run 4 to 6 days, tile and pan run 5 to 7 days, glass measurement and fabrication adds 7 to 10 days because the glass is custom-cut to the exact opening. We can compress to 10 working days on a tight timeline if the homeowner chooses an in-stock tile and a standard glass configuration.

  • Will I lose resale value by removing my only tub?

    It depends on the home. If the tub being converted is one of two or three tubs in the house, the conversion is a clear value-add — Sacramento County buyers strongly prefer walk-in showers in primary and hall baths. If it's your only tub, we recommend keeping at least one bathing option somewhere in the house, especially in family-oriented neighborhoods like Elk Grove, Folsom Empire Ranch, and the Pocket. We'll always run that math with you before you sign.

  • Do you need to move the drain when converting a tub to a shower?

    Almost always, yes. A standard tub drain sits at one end of the tub footprint. A walk-in shower drain typically sits in the center or runs as a linear drain along one side. Moving the drain on a slab-on-grade home (most Sacramento, Folsom, Elk Grove, and Roseville homes built after 1985) requires cutting the slab — about a half-day of work plus a 24-hour cure, $1,800–$2,400 added. On a raised-foundation home (East Sac, Land Park, Curtis Park, older Carmichael) the drain move runs about $900–$1,400 because we have joist access from below.

  • Do I need a permit for a tub-to-shower conversion in Sacramento?

    Yes. Every Sacramento County jurisdiction (City of Sacramento, Sacramento County, Folsom, Elk Grove, Rancho Cordova) requires a plumbing permit for the drain relocation and a building permit for the shower pan and waterproofing. We pull the permit, schedule the inspections, and pass them — homeowners never deal with the building department. Permit fees run $300–$650 depending on jurisdiction.

  • Can you do a curbless walk-in shower in a tub conversion?

    Yes — and we do this routinely on conversions where the homeowner is planning for aging in place or wants the spa look. On a slab-on-grade home we cut and recess the slab to create the slope a curbless entry needs. On a raised-foundation home we furr down the joists in the shower footprint. Curbless adds about $2,200 to a conversion. Low-curb (4") is the most-common choice and works in any home.

  • What happens to the existing tile and walls during the conversion?

    Everything within the tub alcove gets demolished down to studs and subfloor. We tarp the path from the front door to the bathroom, set up dust containment with negative-air machines, and remove the tub, surround tile, drywall behind the tile, and the existing pan and drain. The walls outside the alcove stay (we cut a clean tile-edge transition where the new tile meets the existing wall). About a 2-day demolition window on a typical conversion.

  • What waterproofing do you use behind the new shower?

    Schluter Kerdi or Wedi on every conversion. These are full-membrane waterproofing systems that go behind every shower wall, under the new pan, and up the curb. The 1990s vinyl liner pans and felt-paper backing common in Sacramento County builder-grade tubs are the single most common cause of slow rot we tear out. We will not install a tub-to-shower conversion without a real waterproofing system — it's the difference between a five-year shower and a thirty-year shower.

READY TO GET STARTED?

Ready to Replace That Unused Tub With a Real Walk-In Shower?

Free in-home consultation, three real material options on the spot, a written estimate the same week.

Get a Free Quote